Archive for December, 2009
The Re-build is Racing Ahead!

14.12.09
The Grand Pier re-build is racing ahead. Most of the structural steelwork for the Main Pavilion has now been erected and contractors are starting on the new building which is going on the Pier head. The large steel panels that cover the entire surface area of the Pavilion creating the new floor have also now ….
More Information...


